| General |
|
| |
Thematic
Evaluation of the Danida Plan of Action on Environment and Development.
1995 - 1996. Member of the Core Evaluation Team. Country Studies
to assess Danida's Environmental Performance in Tanzania, Burkina
Faso. |
| Benin
|
|
|
|
Agriculture Sector Programme Support. Technical Assistance
to the Ministry of Rural Development regarding integration of
women in the agricultural and rural development. Responsibility:
Elaboration of training materials. 1998 and 1999. Client: Danida.
|
|
|
Formulation of the intermediate phase of the rural
water supply project PADEAR in the departments of Zou and Atlantique
(2001-2003). Responsibility: Sociological aspects, community development,
and gender aspects. 2000. Danida
|
| |
A joint review of the water supply project PADEAR
in Borgou and Alibori (Projet d'Assistance au Développement
du secteur de l'alimentation en Eau et de l'Assainissement en
milieu Rural). Responsibility: Community Development. 1999. Danida.
|
| Burkina
Faso |
|
| |
Evaluation
of Phase 3 of the environmental education programme: "Un
Espoir dans le Desert" (A hope in the Desert), addressing
both children and adults (in particular women) in the provinces
of Yatenga, Soum and Oudalan. Responsibility: Team Leader. 2000.
Danish Red Cross.
|
|
|
Formulation of the Energy
Sector Programme Support in Burkina Faso, including the component
decentralised rural electrification. Responsibility: Sociological
aspects including gender and poverty aspects, 1999. Client: Danida.
|
|
|
Evaluation of phase 1 of the local radio project “La
Voix du Paysan” (the farmer’s voice) in Ouahigouya in the northern
part of Burkina Faso. The rural population is the main target
group and is involved in the management of the radio. Responsibility:
Team Leader. 1998. Client: Danida.
|
|
|
Institutional assistance to the Ministry of Environment
and Water in Burkina Faso: “Programme Gestion Intégrée des Ressources
en Eau”, Tendering and preparation of pre-qualification documents,
tender documents, evaluation of proposals etc. 1998. Client: Danida.
|
|
|
Report on a Sector Energy Review Mission, 1997. Client:
Danida.
|
|
|
Appraisal of two Rural Water Supply and Health projects
in the Provinces of Boulgou, Kouritenga and Ganzourgou (PIHVES
Phase 2 and Ganzourgou), 1997. Client: Danida.
|
|
|
Appraisal Mission. Evaluation of project documents
for Water Action Plan on Water Resources, 1997. Client: COWI.
|
|
|
Review of the Rural Water Supply and Health Project
“PIHVES” Phase 1 in the provinces of Boulgou and Kouritenga, 1997.
Client: Danida.
|
|
|
Evaluation of Proposal for Consultancy Services for
Strengthening of SONABEL’S Planning Capacity - Master Plan for
Ouahiguya, 1997. Client: Danida.
|
|
|
Formulation of a project document for a rural water
supply project including environmental activities in the provinces
of Passoré, Yatenga, Loroum and Zondoma, 1996. Client: Danida.
|
|
|
Appraisal of two natural resource management projects
in the two Provinces of Boulgou and Séno, 1996. Client: Danida.
|
|
|
Appraisal Mission of a water supply project in the
province of Ganzourgou in Burkina Faso, 1996. Client: Danida.
|
|
|
Review Mission of the water supply project PIHVES in
the Boulgou and Kouritenga Provinces in Burkina Faso, 1996. Client:
Danida.
|
|
|
A joint mid-term evaluation of the water supply project:
"Projet Intégré d'Hydraulique Villageoise et d'Education
pour la Santé" (PIHVES), in the Boulgou and Kouritenga Provinces,
1995. Client: Danida.
|
|
|
A sector study concerning the agricultural sector in
Burkina Faso (desk study), 1995. Client: Danida.
|
|
|
Desk Appraisal of phase 2 of a water quality laboratory
project, 1995. Client: Danida.
|
|
|
Sector study on formal and non-formal basic education
in Burkina Faso. 1994, Client: Danida.
|
|
|
Formulation of an integrated natural and human resources
management programme aiming at a sustainable development in the
Province of Boulgou, 1994. Client: Danida.
|
|
|
Identification/pre-formulation of an integrated rural
development project (natural resources management and training/education)
in the Province of Boulgou, 1993. Client: Danida.
|
|
|
Pre-qualification documents, tender documents, evaluation
of proposals and drafting of contract for an integrated water
supply and health education project in the provinces of Boulgou
and Kouritenga, 1993. Client: Danida.
|
|
|
Appraisal of a rural water supply project including
a substantial health education component, 1992. Client: Danida.
|
| Cameroon
|
|
|
|
Review of technical assistance for a rural water supply
project. The assistance aims at the establishment of village water
committees, technical training and assistance in relation to the
establishment of a private distribution network of spare parts
and of repair services, 1993.
|
| Egypt
|
|
|
|
Preparation of tender documents, tendering and contract
negotiations for “Wind Farm Project at Zafarana”, Component 2,
1998: Client: Danida.
|
|
|
Evaluation of proposal for a Wind Atlas Project for
Egypt, 1997. Client: Danida.
|
|
|
Pre-qualification documents, tender documents, evaluation
of proposals and drafting of contract for "Consultancy and
Supervision Services for Health Care Waste Management Project
at Cairo University Hospital", 1996-1997. Client: Danida.
|
| Gambia
|
|
|
|
Training services, Kotu Power Station, 1990. Client:
Burmeister & Wain Scandinavian Contractor A/S/Danida.
|
| Ghana |
|
| |
Review of Community Water and Sanitation Programme,
Greater Accra and Eastern Regions. Responsibility: Community Development,
sociological aspects, gender aspects.
2000. Danida
|
|
|
Short-Term Assistance for the Initiation of the Energy
Planning of 3 Components. 2000. Client: Danida.
|
|
|
Development of participatory approaches to natural
forest management in Northern Ghana, 1995. Client: The World Bank/Rural
Forestry Division.
|
|
|
Review of “National
Electrification Project” in Central Region CR02, CR03 and Upper
West Region UW01, UW02 in Ghana, 1998. Client: Danida.
|
|
|
Pre-qualification documents, tender documents, evaluation
of proposals and drafting of contract for "Consultancy Services
for Volta River Authority: Training and Development Centre, Ghana",
1996. Client: Danida.
|
|
|
International tendering including preparation of Pre-qualification
documents, tender documents, evaluation of proposals and drafting
of contract for “National Electrification Project” in Central
Region CR02, CR03 and Upper West Region UW01, UW02 in Ghana, 1995
-1996. Client: Danida.
|
|
|
Appraisal of the part of the National Electrification
Project selected for possible Danida financing, 1994.
|
| Guinea |
|
|
|
Review mission of the Urban Water Supply project in
Coyah/Dubreka, 1996. Client: Danida.
|
|
|
Pre-qualification documents, tender documents, evaluation
of proposals and drafting of contract for an integrated water
supply, health and sanitation project in Coyah and Dubréka, 1994.
Client: Danida.
|
|
|
Review of Danish financed urban water supply projects
in five provincial towns (Pita, Kouroussa, Mandiana, Dalaba, and
Kissidougou) and of a sanitation project in Macenta, Republic
of Guinea, 1994. Client: Danida.
|
|
|
Pre-qualification documents, tender documents and
evaluation of proposals for water supply projects in Coyah, Dubréka
and Gaoual, 1992-1993. Client: Danida.
|
|
|
Appraisal and review of a number of Danida financed
urban water supply projects, 1992. Client: Danida.
|
|
|
Evaluation of feasibility studies regarding rural
water supply project, 1990. Client: Danida.
|
| Lesotho |
|
| |
Re-design of waste management project in Lesotho. Project includes
organisation of waste management with a long-term view of achieving
a self-sustainable financing system. Piloting of a waste management
system in Maseru and capacity building of relevant institutions.
2000
|
|
|
Analyses of the formal and non-formal education sector
in Lesotho, South Africa and Namibia with special emphasis on
the environmental issues. Brief review of a number of projects
within the environmental education sector. Outline of strategy
for approaching the environmental education sector and identification
of a number of projects to pursue the strategy. 1999. Client:
Danced.
|
|
|
Preparation of tender documents, tendering and contract
negotiations for Capacity Development in Environmental Management
in Lesotho. 1999. Client: Danced
|
|
|
Preparation of tender documents, tendering and contract
negotiations for Capacity Development in Environmental Management
in Lesotho. 1999. Client: Danced.
|
|
|
Appraisal of Institutional
Capacity Building in Environmental Management in Lesotho. Project
comprises outline of training programmes for environmental units
in all line ministries, capacity development of the National Environmental
Secretariat. Mediator of workshop Session, 1998. Client: Danced
1998.
|
| Liberia
|
|
|
|
Elaboration of Project Document for “Rehabilitation
of Luke Power Plant, 1998. Client: Danida.
|
|
|
Feasibility Study of the Rehabilitation of Luke Power Plant, 1997. Client: Danida.
|
| Malawi
|
|
|
|
Review of natural resource management and capacity
development activities within the Danida (MIFRESTA) environment
programme in Malawi, 2000. Client: Danida.
|
|
|
Workshop on Vocational Education and Training Sector
Reform, 1999. Client Danida.
|
|
|
Preparation of Pre-qualification and Tender Documents
together with evaluation of proposal for the project “Training
in Natural Resources and Environmental Management at Natural Resources
College (NCR)”, 1999. Client: Danida.
|
| Mali |
|
|
|
Evaluation mission of the Phase 1 of an environmental
project in the district of Bamako and the region of Mopti, “Un
Espoir dans le Désert”, 1998. Client: Danish Red Cross.
|
|
|
Review of an urban water supply project in Sikasso.
"Adduction d'Eau Potable dans la Ville de Sikasso",
1995. Client: Danida.
|
|
|
Review of a rural water supply project in the Sikasso
and Kadiolo area. The review aimed in particular at the O &
M system established by the project and the functioning of the
water committees, 1994. Client: Danida.
|
| Mozambique
|
|
|
|
Mid-Term Review of the Inhambane
Power Project consisting of the 110 kV transmission line from
Xai-Xai to Lindela/Inhambane and a new Back-up power station in
Inhambane (2 x 1.5 MVA) as the two main components, 1999. Client:
Danida
|
|
|
Elaboration of pre-qualification and evaluation reports
for the project “Con-struction of a Teacher Training Centre in
Tete Province, 1996. Client Danida.
|
| Namibia
|
|
| |
Design of NGO project for development of environmental
education in Namibia. The project includes material development
and teacher development in the formal, in-formal and non-formal
sector. In addition, the project supports further development
of networking and co-operation between NGOs, parastatals and governmental
institutions within environmental education. 2000
|
|
|
Pre-qualification documents, tender documents, evaluation
of proposals and drafting of contract for community forestry and
extension development in Central North Namibia, 1996. Client:
Danced.
|
| Niger
|
|
| |
Appraisal
of proposed water project in the Diffa and Zinder Regions in the
eastern part of Niger. Responsibility: Sociological and environmental
aspects as well as hygiene education. 2001. Danida
|
|
|
Identification of a demand driven water supply project
in the Zinder and Diffa regions, 1995. Client: Danida.
|
|
|
Redrafting of project document and drafting of pre-qualification
documents, tender/standard contractual documents for a natural
resources management project in Zinder region, the Republic
of Niger. 1995. Client: Danida.
|
|
|
Pre-qualification, tendering and evaluation of proposals
and drafting of contract for a natural resources development and
management project in Diffa and Zinder regions, the Republic of
Niger. 1993-1994 Client: Danida.
|
|
|
Regional workshop on natural resources management aiming
at a harmonization and operationalization of the concept of "Gestion
des Terroirs" for a sustainable development - Niamey, 11-15
April 1994". Client: Danida.
|
|
|
Review of project document for a natural resources
development and management project in Diffa- and Zinder regions
in the Republic of Niger, 1993-1994. Client: Danida.
|
|
|
Fact Finding Mission aiming at defining objectives
for future Danida intervention in Niger with special emphasis
on natural resources management, 1993. Client: Danida.
|
| SAHEL-Countries
|
|
|
|
Preparation of internal Danida seminar aiming at 1.
briefing Danida-staff on issues related on natural resources management
in the SAHEL Area and 2. starting a process that could eventually
lead to a policy formulation in this field, 1994. Client: Danida.
|
|
|
Development and evaluation of a project for system-integrated
rural water and power supply in SAHEL-countries with emphasis
on institutional arrangements and community participation, 1990-1991.
Client: Burmeister & Wain Scandinavian Contractor A/S.
|
| Senegal
|
|
|
|
Evaluation of a Danish Red Cross Project: "Un
espoir dans le désert", 1996.
|
|
|
Danida part of the UNSO Evaluation of the Ecological
Monitoring Centre, Dakar, Senegal, 1995. Client: Danida.
|
| Sierra
Leone |
|
|
|
Rehabilitation/restructuring of urban provincial water
supply, 1994. Feasibility studies on the rehabilitation and re-organization
of the water supply systems in five provincial towns. Pilot project
defined. Client: United Nations Development Programme, UNDP.
|
|
|
Review of the power sector situation in Sierra Leone,
1991. Client: The World Bank/UNDP.
|
|
|
Administrative/financial support to Bo Power Station,
1990-1992. Accounts, budgeting, commercial operations, administrative
systems and procedures, training and HRD. Client: /BWSC/Danida.
|
| Somalia
|
|
|
|
Fisheries Development, Water Supply & Sanitation
Programme implemented by Ocean Training and Promotion in the North-East
of Somalia. Evaluation of the 1st Phase of the programme
financed by Danida. 1999. Client: DanChurchAid.
|
| South
Africa |
|
| |
Tendering of the project "Capacity development
in participatory forest management in indigenous state forests,
DWAF, South Africa. 2001. Danced |
| |
Design of nation wide environmental education programme
in South Africa. The project includes development of curriculum
to integrate environmental learning on the General Education Band,
pre-service teacher training through regional up-graded staff, and
support to preparation of relevant environmental learning material.
2000. Danced |
|
|
Capacity Building. Mid-Term Review of Protection of
Endangered Species of Wild Fauna and Flora in Relation to National
and International Trade. (CITES Convention Implementation Project.
Assessment of Project Planning, Strategic Outline and Project
and Management. 1999. Client: Danced.
|
|
|
Report for Manufacturing Advisory Centre Pilot Programme.
Tools and Training. 1999. Client: Danida.
|
|
|
Team Leader. Design of Regional Basel Convention
Training and Technology Transfer Centre for all English speaking
African countries, Mediator of workshop with participation of
all 20 English speaking countries, design of organisational and
management set-up. Strategic capacity development plan developed.1999.
Analysis of legal framework. Client: Danida.
|
|
|
Team Leader. Fact finding mission
for identification of host institution and South African government
support to establishing of Hazardous Waste training centre in
Pretoria. Assessment of current and required capacity for the
Centre, 1999. Client: Danced.
|
|
|
Team Leader. Review of environmental
educational programme in province of Gauteng and Mpumalanga in
South Africa in relation to national educational policy. Semi-structured
interview with teachers and curriculum implementers. Assessment
of project management. Proposals for improvement of project orientation,
1999. Client: Danced
|
|
|
Team Leader on a tools and
training project aiming at Manufacturing Advisory Service Centres.
The tools comprise business diagnostics, work force development,
and environmental audit and technology acquisition. 6 m-m.
1998 - 1999, Client: Danida
|
|
|
Implementation and Evaluation of Provincial Skills
Development PIE-VET Pilot Project, 1997. Client: Danida.
|
|
|
Occasional training for a PIE-VET Pilot Project, 1997.
Client: Danida.
|
|
|
Project design mission aiming at assessing a project
proposal received from the Department of Water Affairs and Forestry
and to produce a project document on a social forestry project
in the Eastern Transvaal based on this assessment, 1995. Client:
Danced.
|
| Sudan
|
|
|
|
Consolidation phase for a water yard rehabilitation
project in the Sudan, 1992-1994. Client: Danida.
|
|
|
Technical assistance concerning rehabilitation of 150
water yards in the Sudan, 1990-1992. Client: Danida.
|
| Swaziland
|
|
|
|
Preparation of Tender Documents, management of Tendering
process, and Tender Evaluation including staff evaluation, assessment
of proposed project approaches and contract negotiations for National
Solid Waste Management Strategy. 1999-2000. Client: Danced.
|
|
|
Appraisal and re-design of
Institutional Capacity Development Project for all ministries
and agencies in relation to developing of a solid waste management
strategy. Project comprises solid waste handling in all sectors
in Swaziland and includes change management proposal for institutional
set-up. Mediator of workshop Session, 1998. Client: Danced.
|
| Tanzania
|
|
|
|
Tendering, including preparation
of pre-qualification documents, tender documents, evaluation of
proposals, drafting of contract, etc. for: "Rehabilitation
of the Dar es Salaam-Mlandizi Road and Improvement of Wami Bridge
Approaches", 1996. Client: Danida.
|
|
|
Project Review Mission: Singida-Arusha
Transmission Line, 1996. Client: Danida.
|
|
|
International tendering including
preparation of pre-qualification documents, tender documents,
evaluation of proposals and drafting of contract for “Rural Water
Supply Project in Iringa, Mbeya and Ruvuma Regions, Phase IV”,
1996. Client: Danida.
|
|
|
A formulation mission for Danida
support to implementation of Phase IV of a rural water supply
programme in Iringa, Mbeya and Ruvuma Regions, 1994. Client:
Danida.
|
|
|
Technical assistance related
to power system rehabilitation, Zanzibar and Pemba Islands, 1992-1998.
Client: Zanzibar State Fuel and Power Corporation (SFPC).
|
| Uganda
|
|
|
|
Tendering, including preparation of pre-qualification
documents, tender documents, evaluation of proposals, drafting
of contract, etc. for: "Support to Water Resources Management
Department, Phase 2, Uganda., 2000. Client: Danida.
|
|
|
Tendering, including preparation
of pre-qualification documents, tender documents, evaluation
of proposals, drafting of contract, etc. for: "Eastern Centres
Water and Sanitation Project", 1996. Client: Danida.
|
| Zimbabwe
|
|
|
|
Fact finding mission in relation to tendering for Telecommunication
Cable Projects, Harare Main Exchange and Southerton Exchange,
1997. Client: Danida.
|
|
|
Program Formulation for Danida-administered MIKA-funds
(Miljøkatastroferammen), 1996.
|